@@ -7,6 +7,46 @@ The operational activities of PTTEP cover a significant area within Myanmar, inc
|
|
7 |
- Ban-I-Tong Metering Station.
|
8 |
|
9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10 |
1.1. Yadana Development History (Offshore)
|
11 |
1. Phase 1 (Installation of WP2):
|
12 |
• Remote wellhead platform (WP2) installed with a 20" subsea production line.
|
@@ -1566,4 +1606,44 @@ of theasset.
|
|
1566 |
▪ Identification of areas for improvement that will result in progressively better SSHE
|
1567 |
management.
|
1568 |
The outcomes of SSHE audits and reviews are managed to facilitate the implementation of
|
1569 |
-
changestoenhanceprocessesandreducerisks.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
- Ban-I-Tong Metering Station.
|
8 |
|
9 |
|
10 |
+
Important Glossary:(very important)
|
11 |
+
WP1= wellhead platform 1
|
12 |
+
WP2= wellhead platform 2
|
13 |
+
WP3= wellhead platform 3
|
14 |
+
WP4= wellhead platform 4
|
15 |
+
QP2 = QUarter Platform
|
16 |
+
PP = Producrion Platform
|
17 |
+
LCP = low compression platform
|
18 |
+
MCP = Medium Compression Platform
|
19 |
+
FP= Flare Platform
|
20 |
+
|
21 |
+
1. ESD Levels:
|
22 |
+
• ESD Level 0: Abandon installation, initiates a black shutdown.
|
23 |
+
• ESD Level 1: General emergency shutdown, closes all ESVs and initiates blow-down.
|
24 |
+
• ESD Level 2: General process shutdown, stops production.
|
25 |
+
• ESD Level 3: Individual process shutdown.
|
26 |
+
|
27 |
+
|
28 |
+
• ESD0 initiated automatically on confirmed gas detection or manually with approval.
|
29 |
+
• ESD1 initiated by F&G system and push buttons.
|
30 |
+
• ESD2 initiated by key safety switches and push buttons.
|
31 |
+
|
32 |
+
• Each platform is equipped with its own ESD system.
|
33 |
+
• Connected to the Control Room via hardwire link or telemetry system.
|
34 |
+
• PLC used for ESD control, with operator interface and DCS console.
|
35 |
+
|
36 |
+
• Local independent electro-hydraulic panel for shutdown execution.
|
37 |
+
• ESD actions can be initiated from the Control Room.
|
38 |
+
|
39 |
+
• Local resetting required on ESVs and SDVs after any ESD level.
|
40 |
+
• BDVs can be reset from the Control Room.
|
41 |
+
• Partial stroking facilities for ESD Valve Function testing.
|
42 |
+
|
43 |
+
• ESD 0 push buttons hardwired to platform ESD systems.
|
44 |
+
• Dedicated HS for blowout disabling during rig operation.
|
45 |
+
• Partial stroking facilities for ESV valves for testing purposes.
|
46 |
+
|
47 |
+
|
48 |
+
________________________________
|
49 |
+
|
50 |
1.1. Yadana Development History (Offshore)
|
51 |
1. Phase 1 (Installation of WP2):
|
52 |
• Remote wellhead platform (WP2) installed with a 20" subsea production line.
|
|
|
1606 |
▪ Identification of areas for improvement that will result in progressively better SSHE
|
1607 |
management.
|
1608 |
The outcomes of SSHE audits and reviews are managed to facilitate the implementation of
|
1609 |
+
changestoenhanceprocessesandreducerisks.
|
1610 |
+
|
1611 |
+
|
1612 |
+
_____________
|
1613 |
+
Important Glossary:(very important)
|
1614 |
+
WP1= wellhead platform 1
|
1615 |
+
WP2= wellhead platform 2
|
1616 |
+
WP3= wellhead platform 3
|
1617 |
+
WP4= wellhead platform 4
|
1618 |
+
QP2 = QUarter Platform
|
1619 |
+
PP = Producrion Platform
|
1620 |
+
LCP = low compression platform
|
1621 |
+
MCP = Medium Compression Platform
|
1622 |
+
FP= Flare Platform
|
1623 |
+
|
1624 |
+
1. ESD Levels:
|
1625 |
+
2.
|
1626 |
+
• ESD Level 0: Abandon installation, initiates a black shutdown.
|
1627 |
+
• ESD Level 1: General emergency shutdown, closes all ESVs and initiates blow-down.
|
1628 |
+
• ESD Level 2: General process shutdown, stops production.
|
1629 |
+
• ESD Level 3: Individual process shutdown.
|
1630 |
+
|
1631 |
+
|
1632 |
+
• ESD0 initiated automatically on confirmed gas detection or manually with approval.
|
1633 |
+
• ESD1 initiated by F&G system and push buttons.
|
1634 |
+
• ESD2 initiated by key safety switches and push buttons.
|
1635 |
+
|
1636 |
+
• Each platform is equipped with its own ESD system.
|
1637 |
+
• Connected to the Control Room via hardwire link or telemetry system.
|
1638 |
+
• PLC used for ESD control, with operator interface and DCS console.
|
1639 |
+
|
1640 |
+
• Local independent electro-hydraulic panel for shutdown execution.
|
1641 |
+
• ESD actions can be initiated from the Control Room.
|
1642 |
+
|
1643 |
+
• Local resetting required on ESVs and SDVs after any ESD level.
|
1644 |
+
• BDVs can be reset from the Control Room.
|
1645 |
+
• Partial stroking facilities for ESD Valve Function testing.
|
1646 |
+
|
1647 |
+
• ESD 0 push buttons hardwired to platform ESD systems.
|
1648 |
+
• Dedicated HS for blowout disabling during rig operation.
|
1649 |
+
• Partial stroking facilities for ESV valves for testing purposes.
|