question
stringlengths 58
131
| QuestionText
stringlengths 7
54
| context
stringlengths 72
1.68k
| Sector
stringclasses 19
values | Country
stringlengths 4
32
| answers
dict | Document
stringclasses 4
values | Alpha3
stringlengths 3
3
| SubSector
stringlengths 3
91
| split
stringclasses 3
values | Question_Definition
stringlengths 10
78
| id
stringlengths 1
5
|
---|---|---|---|---|---|---|---|---|---|---|---|
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
19,
27
],
"text": [
"management and management",
"disaster risk management"
]
} | First NDC | AGO | Early warning system | train | GCA_Sector | 600 |
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ? | Adapt Now subsector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
19,
27
],
"text": [
"management and management",
"disaster risk management"
]
} | First NDC | AGO | Early warning system | train | GCA_subsector | 601 |
What are the Adaptation action/priority for the Cross-Cutting Area Sector? | Action and priority | Early warning system and disaster risk management. Early warning system. 3,500,000. 8. National institutional mechanism for adaptation planning and mainstreaming. 2,000,000. 9. Soil erosion control through organic methods. Terrestrial ecosystems. 4,000,000. 10. Diversify crops to less climate sensitive cultures. Agriculture and food security. 3,000,000. 11. Technology needs assessment. 500.000. 12. | Cross-Cutting Area | Angola | {
"answer_start": [
29
],
"text": [
"soil erosion control through organic methods. terrestrial ecosystems"
]
} | First NDC | AGO | Landscape management | train | Adaptation action/priority | 602 |
What are the Adaptation action/priority for the Cross-Cutting Area Sector? | Action and priority | Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19. | Cross-Cutting Area | Angola | {
"answer_start": [
33
],
"text": [
"management. 3,000,000. 17. map areas of erosion risk. terrestrial ecosystems"
]
} | First NDC | AGO | Landscape management | train | Adaptation action/priority | 603 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Cross-Cutting Area | Angola | {
"answer_start": [
16,
27
],
"text": [
"soil and water management and management",
"disaster risk management"
]
} | First NDC | AGO | Landscape management | train | GCA_Sector | 604 |
Which subsector forms part of global climate change adaptation subsector in Cross-Cutting Area Sector ? | Adapt Now subsector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Cross-Cutting Area | Angola | {
"answer_start": [
16
],
"text": [
"soil and water management and management"
]
} | First NDC | AGO | Landscape management | train | GCA_subsector | 605 |
What are the Adaptation action/priority for the Disaster Risk Management (DRM) Sector? | Action and priority | The project aims to build resilience and reduce vulnerability of the Benguela Current marine fisheries systems to climate change through strengthened adaptive capacity and implementation of participatory and integrated adaptive strategies in order to ensure food and livelihood security. Fisheries. Agriculture and food security. Total project cost (US $ million): 16.520. Implementing GEF agency: FAO. Promoting climate- resilient development and enhanced adaptive capacity to withstand disaster risks in Angola’s Cuvelai River Basin. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
15,
63
],
"text": [
"systems to climate change through strengthened adaptive capacity",
"promoting climate- resilient development and enhanced adaptive capacity to withstand disaster risks in angola’s cuvelai river basin"
]
} | First NDC | AGO | Disaster Risk Management (DRM): General | train | Adaptation action/priority | 606 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
16,
27
],
"text": [
"soil and water management and management",
"disaster risk management"
]
} | First NDC | AGO | Disaster Risk Management (DRM): General | test | GCA_Sector | 607 |
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ? | Adapt Now subsector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
16,
27
],
"text": [
"soil and water management and management",
"disaster risk management"
]
} | First NDC | AGO | Disaster Risk Management (DRM): General | train | GCA_subsector | 608 |
What are the Adaptation action/priority for the Disaster Risk Management (DRM) Sector? | Action and priority | Disaster risk reduction/ management to support agropastoral communities affected by recurrent droughts and other natural disasters in southern Angola and northern Namibia (Project PIRAN). The objective is to strengthen food security and DRR/M, and increase the resilience of agro-pastoral livelihoods by increasing capacity to manage risks related to natural disasters at the level of communities and local institutions. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
0,
53
],
"text": [
"disaster risk reduction/ management to support agropastoral communities affected by recurrent droughts and other natural disasters in southern angola and northern namibia (project piran",
"risks related to natural disasters"
]
} | First NDC | AGO | Disaster Risk Management (DRM): General | train | Adaptation action/priority | 609 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
16,
27
],
"text": [
"soil and water management and management",
"disaster risk management"
]
} | First NDC | AGO | Disaster Risk Management (DRM): General | train | GCA_Sector | 610 |
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ? | Adapt Now subsector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
16,
27
],
"text": [
"soil and water management and management",
"disaster risk management"
]
} | First NDC | AGO | Disaster Risk Management (DRM): General | train | GCA_subsector | 611 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector (2) | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
14,
27
],
"text": [
"nutrition, soil and water management and management",
"disaster risk management. agriculture and food security"
]
} | First NDC | AGO | Disaster Risk Management (DRM): General | train | GCA_Sector_2 | 612 |
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ? | Adapt Now subsector (2) | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
16,
27
],
"text": [
"soil and water management and management",
"disaster risk management"
]
} | First NDC | AGO | Disaster Risk Management (DRM): General | train | GCA_Subsector_2 | 613 |
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ? | Adapt Now subsector (3) | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
16,
27
],
"text": [
"soil and water management and management",
"disaster risk management"
]
} | First NDC | AGO | Disaster Risk Management (DRM): General | train | GCA_Subsector_3 | 614 |
What are the Adaptation action/priority for the Agriculture Sector? | Action and priority | Disaster risk reduction/ management to support agropastoral communities affected by recurrent droughts and other natural disasters in southern Angola and northern Namibia (Project PIRAN). The objective is to strengthen food security and DRR/M, and increase the resilience of agro-pastoral livelihoods by increasing capacity to manage risks related to natural disasters at the level of communities and local institutions. | Agriculture | Angola | {
"answer_start": [
0,
53
],
"text": [
"disaster risk reduction/ management to support agropastoral communities affected by recurrent droughts and other natural disasters in southern angola and northern namibia (project piran",
"risks related to natural disasters"
]
} | First NDC | AGO | Agriculture: General | train | Adaptation action/priority | 615 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Agriculture | Angola | {
"answer_start": [
19,
27
],
"text": [
"management and management",
"disaster risk management. agriculture"
]
} | First NDC | AGO | Agriculture: General | train | GCA_Sector | 616 |
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ? | Adapt Now subsector | Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5. | Agriculture | Angola | {
"answer_start": [
35,
54
],
"text": [
"vulnerability of the fisheries",
"fisheries, agriculture"
]
} | First NDC | AGO | Agriculture: General | train | GCA_subsector | 617 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector (2) | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Agriculture | Angola | {
"answer_start": [
31
],
"text": [
"agriculture and food security"
]
} | First NDC | AGO | Agriculture: General | val | GCA_Sector_2 | 618 |
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ? | Adapt Now subsector (2) | Many of the economy sectors of Angola have been impacted by climate variability in the last thirty years, namely the Agriculture, Coastal Zone, Land-Use, Forests, Ecosystems andBiodiversity, Water resources, Health. However, there are economy sectors which are extremely vulnerable to impacts resulting from the extreme events and which will pose not only serious livelihood and direct health risks but can also affect the economic potential and national food security. | Agriculture | Angola | {
"answer_start": [
21
],
"text": [
"agriculture, coastal zone"
]
} | First NDC | AGO | Agriculture: General | train | GCA_Subsector_2 | 619 |
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ? | Adapt Now subsector (3) | Therefore within the context of this INDC, Angola prioritises the implementation of Adaptation measures in the following main sectors:. Agriculture. Coastal Zone. Land-Use, Forests, Ecosystems and Biodiversity. Water resources. Health. | Agriculture | Angola | {
"answer_start": [
22
],
"text": [
"agriculture. coastal zone"
]
} | First NDC | AGO | Agriculture: General | train | GCA_Subsector_3 | 620 |
What are the Adaptation action/priority for the Disaster Risk Management (DRM) Sector? | Action and priority | 5. Extend electricity grid to rural areas*. Energy. Electricity provision. 5,000,000. 6. Revise sectoral laws for proactive adaptation. 2,000,000. 7. Create an early warning system for flooding and storms. Early warning system and disaster risk management. Early warning system. 3,500,000. 8. National institutional mechanism for adaptation planning and mainstreaming. 2,000,000. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
30
],
"text": [
"create an early warning system for flooding and storms. early warning system and disaster risk management. early warning system"
]
} | First NDC | AGO | Early warning system | train | Adaptation action/priority | 621 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
19,
27
],
"text": [
"management and management",
"disaster risk management"
]
} | First NDC | AGO | Early warning system | train | GCA_Sector | 622 |
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ? | Adapt Now subsector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
19,
27
],
"text": [
"management and management",
"disaster risk management"
]
} | First NDC | AGO | Early warning system | train | GCA_subsector | 623 |
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ? | Adapt Now subsector (2) | Enhancement of coastal adaptive capacities at the institutional, systemic and community levels; response to urgent needs posed by climate change. Coastal zones/Marine ecosystems. Total project cost (US $ million): 17.850. Implementing GEF agency: UNEP. Disaster risk reduction/ management to support agropastoral communities affected by recurrent droughts and other natural disasters in southern Angola and northern Namibia (Project PIRAN). | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
20,
45,
56
],
"text": [
"climate change. coastal zones",
"disaster risk reduction/ management",
"droughts and other natural disasters"
]
} | First NDC | AGO | Early warning system | train | GCA_Subsector_2 | 624 |
What are the Adaptation action/priority for the Economy-wide Sector? | Action and priority | Among the priorities identified in the NAPA, two policy measures are noteworthy: revise sectoral laws for proactive adaptation; national institutional mechanism for adaptation planning and mainstreaming. Accordingly, Angola has developed in recent years various national plans and strategies which include activities relevant to climate change, including the:. | Economy-wide | Angola | {
"answer_start": [
15
],
"text": [
"sectoral laws for proactive adaptation"
]
} | First NDC | AGO | Economy-wide: General | train | Adaptation action/priority | 625 |
What are the Adaptation action/priority for the Economy-wide Sector? | Action and priority | Among the priorities identified in the NAPA, two policy measures are noteworthy: revise sectoral laws for proactive adaptation; national institutional mechanism for adaptation planning and mainstreaming. Accordingly, Angola has developed in recent years various national plans and strategies which include activities relevant to climate change, including the:. | Economy-wide | Angola | {
"answer_start": [
19
],
"text": [
"adaptation; national institutional mechanism for adaptation"
]
} | First NDC | AGO | Economy-wide: General | train | Adaptation action/priority | 626 |
What are the Adaptation action/priority for the Economy-wide Sector? | Action and priority | 20. Extend water and sanitation network to rural areas. Water resources. Infrastructure. 10,000,000. 21. Explore industrial opportunities from climate change. 1,000,000. 22. Monitor groundwater. Water resources. 3,000,000. 23. Construct flood protection barriers along major rivers. Water resources. Disaster risk management. 5,000,000. 24. | Economy-wide | Angola | {
"answer_start": [
21
],
"text": [
"industrial opportunities from climate change"
]
} | First NDC | AGO | Economy-wide: General | train | Adaptation action/priority | 627 |
What are the Adaptation action/priority for the Economy-wide Sector? | Action and priority | Study impacts of sedimentation and siltation rates on coastal processes. Coastal zones/marine ecosystems. 3,500,000. 25. Improve design and construction of buildings. Infrastructure. 1,000,000. 26. Study impact of climate change on hydroelectricity. Water resources. Energy. 1,000,000. 27. Revise building codes to promote retreat from flood plains and coastal zones. 1,000,000. 28. | Economy-wide | Angola | {
"answer_start": [
21
],
"text": [
"improve design and construction of buildings. infrastructure"
]
} | First NDC | AGO | Economy-wide: General | train | Adaptation action/priority | 628 |
Which subsector forms part of global climate change adaptation subsector in Economy-wide Sector ? | Adapt Now subsector | 5. Extend electricity grid to rural areas*. Energy. Electricity provision. 5,000,000. 6. Revise sectoral laws for proactive adaptation. 2,000,000. 7. Create an early warning system for flooding and storms. Early warning system and disaster risk management. Early warning system. 3,500,000. 8. National institutional mechanism for adaptation planning and mainstreaming. 2,000,000. | Economy-wide | Angola | {
"answer_start": [
32,
40,
48
],
"text": [
"early warning system",
"early warning system",
"early warning system"
]
} | First NDC | AGO | Economy-wide: General | train | GCA_subsector | 629 |
What are the Adaptation action/priority for the Economy-wide Sector? | Action and priority | 5. Extend electricity grid to rural areas*. Energy. Electricity provision. 5,000,000. 6. Revise sectoral laws for proactive adaptation. 2,000,000. 7. Create an early warning system for flooding and storms. Early warning system and disaster risk management. Early warning system. 3,500,000. 8. National institutional mechanism for adaptation planning and mainstreaming. 2,000,000. | Economy-wide | Angola | {
"answer_start": [
32,
40,
48
],
"text": [
"early warning system",
"early warning system",
"early warning system"
]
} | First NDC | AGO | Economy-wide: General | val | Adaptation action/priority | 630 |
What are the Adaptation action/priority for the Energy Sector? | Action and priority | 5. Extend electricity grid to rural areas*. Energy. Electricity provision. 5,000,000. 6. Revise sectoral laws for proactive adaptation. 2,000,000. 7. Create an early warning system for flooding and storms. Early warning system and disaster risk management. Early warning system. 3,500,000. 8. National institutional mechanism for adaptation planning and mainstreaming. 2,000,000. | Energy | Angola | {
"answer_start": [
2,
32,
40,
48
],
"text": [
"extend electricity grid to rural areas*. energy. electricity",
"early warning system",
"early warning system",
"early warning system"
]
} | First NDC | AGO | Energy access | val | Adaptation action/priority | 631 |
What are the Adaptation action/priority for the Energy Sector? | Action and priority | Construction of hydroelectric and thermal power plants (CaculoCabaça, Soyo …) that will generate about five thousand megawatts, during the period 2013/2017. Energy. Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. Energy and Water Sector Action Plan 2013-2017. | Energy | Angola | {
"answer_start": [
34,
42
],
"text": [
"energy and water",
"energy. energy and water sector action plan 2013"
]
} | First NDC | AGO | Energy: General | train | Adaptation action/priority | 632 |
Which subsector forms part of global climate change adaptation subsector in Energy Sector ? | Adapt Now subsector | Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. | Energy | Angola | {
"answer_start": [
36,
49
],
"text": [
"water resources. water",
"water resources integrated management. water resources. water management"
]
} | First NDC | AGO | Energy: General | train | GCA_subsector | 633 |
What are the Adaptation action/priority for the Water Sector? | Action and priority | Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. | Water | Angola | {
"answer_start": [
36,
46
],
"text": [
"water resources. water",
"16. implement water resources integrated management. water resources. water management"
]
} | First NDC | AGO | Water: General | train | Adaptation action/priority | 634 |
Which subsector forms part of global climate change adaptation subsector in Water Sector ? | Adapt Now subsector | Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. | Water | Angola | {
"answer_start": [
36,
49
],
"text": [
"water resources. water",
"water resources integrated management. water resources. water management"
]
} | First NDC | AGO | Water: General | train | GCA_subsector | 635 |
What are the Adaptation action/priority for the Energy Sector? | Action and priority | Total project cost (US $ million): 150 (to 2025). Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. Construction of hydroelectric and thermal power plants. Construction of hydroelectric and thermal power plants (CaculoCabaça, Soyo …) that will generate about five thousand megawatts, during the period 2013/2017. | Energy | Angola | {
"answer_start": [
28
],
"text": [
"energy. construction of hydroelectric and thermal power plants. construction of hydroelectric and thermal power plants"
]
} | First NDC | AGO | Power system planning | train | Adaptation action/priority | 636 |
What are the Adaptation action/priority for the Energy Sector? | Action and priority | To reduce the current unsustainable and GHG-intensive biomass production and utilization from Angola's Miombo woodlands via an integrated suite of interventions in the country's charcoal value chain. Renewable energy. Forestry. Total project cost (US $ million): 17.884. Implementing GEF agency: UNDP. The “Solar Village” Programme. The “Solar Village” Programme, launched by the Executive under the National Development Plan (PND) 2013-2017, allowed to date the electrification of 48 villages in different regions of the country, benefiting 100,000 families. | Energy | Angola | {
"answer_start": [
55
],
"text": [
"solar village” programme. the “solar village” programme"
]
} | First NDC | AGO | Renewable energy | train | Adaptation action/priority | 637 |
What are the Adaptation action/priority for the Energy Sector? | Action and priority | The estimated cost of implementing the NAPA priority projects amounts to over 500 million USD if current inflation rates are applied to 2011 costing. PROJECT TITLE. PROJECT SECTOR. SECTOR COMPONENT(S). PROJECT COST (USD). 1. Promote alternative renewable energies to avoid deforestation*. Energy. Renewable energy, Forestry. 3,500,000*. 2. | Energy | Angola | {
"answer_start": [
43
],
"text": [
"promote alternative renewable energies to avoid deforestation*. energy. renewable energy"
]
} | First NDC | AGO | Renewable energy | train | Adaptation action/priority | 638 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Energy | Angola | {
"answer_start": [
19,
27
],
"text": [
"management and management",
"disaster risk management"
]
} | First NDC | AGO | Renewable energy | train | GCA_Sector | 639 |
Which subsector forms part of global climate change adaptation subsector in Energy Sector ? | Adapt Now subsector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Energy | Angola | {
"answer_start": [
19,
27
],
"text": [
"management and management",
"disaster risk management"
]
} | First NDC | AGO | Renewable energy | train | GCA_subsector | 640 |
What are the Adaptation action/priority for the LULUCF/Forestry Sector? | Action and priority | The estimated cost of implementing the NAPA priority projects amounts to over 500 million USD if current inflation rates are applied to 2011 costing. PROJECT TITLE. PROJECT SECTOR. SECTOR COMPONENT(S). PROJECT COST (USD). 1. Promote alternative renewable energies to avoid deforestation*. Energy. Renewable energy, Forestry. 3,500,000*. 2. | LULUCF/Forestry | Angola | {
"answer_start": [
43
],
"text": [
"promote alternative renewable energies to avoid deforestation*. energy. renewable energy, forestry"
]
} | First NDC | AGO | LULUCF/Forestry: General | train | Adaptation action/priority | 641 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | LULUCF/Forestry | Angola | {
"answer_start": [
19,
27
],
"text": [
"management and management",
"disaster risk management"
]
} | First NDC | AGO | LULUCF/Forestry: General | train | GCA_Sector | 642 |
Which subsector forms part of global climate change adaptation subsector in LULUCF/Forestry Sector ? | Adapt Now subsector | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | LULUCF/Forestry | Angola | {
"answer_start": [
19,
27
],
"text": [
"management and management",
"disaster risk management"
]
} | First NDC | AGO | LULUCF/Forestry: General | train | GCA_subsector | 643 |
What are the Adaptation action/priority for the Energy Sector? | Action and priority | Study impact of climate change on hydroelectricity. Water resources. Energy. 1,000,000. 27. Revise building codes to promote retreat from flood plains and coastal zones. 1,000,000. 28. Construct sea level protection structure. Infrastructure. Coastal zones and marine ecosystems. 10,000,000. 29. Study impact of climate change on mining. Energy. 500.000. **Total. 107,500,000. | Energy | Angola | {
"answer_start": [
0,
52
],
"text": [
"study impact of climate change on hydroelectricity",
"study impact of climate change on mining. energy"
]
} | First NDC | AGO | Renewable Energy: Hydro | train | Adaptation action/priority | 644 |
Which subsector forms part of global climate change adaptation subsector in Energy Sector ? | Adapt Now subsector | Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. Energy and Water Sector Action Plan 2013-2017. A characterisation of the two sub-sectors, including infrastructure and the institutional component, which result in commonalities, e.g. | Energy | Angola | {
"answer_start": [
6,
14
],
"text": [
"energy and water",
"energy. energy and water"
]
} | First NDC | AGO | Renewable Energy: Hydro | train | GCA_subsector | 645 |
What are the Adaptation action/priority for the Health Sector? | Action and priority | Agriculture and food security. 5,000,000. 13. Climate monitoring and data management system. Early warning system and disaster risk management. 17,500,000. 14. Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes. | Health | Angola | {
"answer_start": [
0,
28
],
"text": [
"agriculture and food security",
"study the implication of climate change on disease patterns for humans and livestock. agriculture and food security. health"
]
} | First NDC | AGO | Disease surveillance and control | train | Adaptation action/priority | 646 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5. | Health | Angola | {
"answer_start": [
18
],
"text": [
"health services and health monitoring*. health. health"
]
} | First NDC | AGO | Disease surveillance and control | test | GCA_Sector | 647 |
Which subsector forms part of global climate change adaptation subsector in Health Sector ? | Adapt Now subsector | Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5. | Health | Angola | {
"answer_start": [
18
],
"text": [
"health services and health monitoring*. health. health"
]
} | First NDC | AGO | Disease surveillance and control | train | GCA_subsector | 648 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector (2) | Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5. | Health | Angola | {
"answer_start": [
0,
18,
56
],
"text": [
"agriculture and food security",
"health services and health monitoring*. health. health",
"agriculture and food security"
]
} | First NDC | AGO | Disease surveillance and control | train | GCA_Sector_2 | 649 |
Which subsector forms part of global climate change adaptation subsector in Health Sector ? | Adapt Now subsector (2) | Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5. | Health | Angola | {
"answer_start": [
18
],
"text": [
"health services and health monitoring*. health. health"
]
} | First NDC | AGO | Disease surveillance and control | val | GCA_Subsector_2 | 650 |
What are the Adaptation action/priority for the Agriculture Sector? | Action and priority | Agriculture and food security. 5,000,000. 13. Climate monitoring and data management system. Early warning system and disaster risk management. 17,500,000. 14. Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes. | Agriculture | Angola | {
"answer_start": [
0,
14,
28
],
"text": [
"agriculture and food security",
"system. early warning system",
"study the implication of climate change on disease patterns for humans and livestock. agriculture and food security"
]
} | First NDC | AGO | Livestock | train | Adaptation action/priority | 651 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | 5. Extend electricity grid to rural areas*. Energy. Electricity provision. 5,000,000. 6. Revise sectoral laws for proactive adaptation. 2,000,000. 7. Create an early warning system for flooding and storms. Early warning system and disaster risk management. Early warning system. 3,500,000. 8. National institutional mechanism for adaptation planning and mainstreaming. 2,000,000. | Agriculture | Angola | {
"answer_start": [
32,
40,
48
],
"text": [
"early warning system",
"early warning system",
"early warning system"
]
} | First NDC | AGO | Livestock | train | GCA_Sector | 652 |
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ? | Adapt Now subsector | Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5. | Agriculture | Angola | {
"answer_start": [
18
],
"text": [
"health services and health monitoring*. health. health"
]
} | First NDC | AGO | Livestock | train | GCA_subsector | 653 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector (2) | The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. | Agriculture | Angola | {
"answer_start": [
23,
31
],
"text": [
"early warning systems",
"agriculture and food security"
]
} | First NDC | AGO | Livestock | train | GCA_Sector_2 | 654 |
What are the Adaptation action/priority for the Health Sector? | Action and priority | Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5. | Health | Angola | {
"answer_start": [
14
],
"text": [
"ensure basic access to health services and health monitoring*. health. health"
]
} | First NDC | AGO | Health services and assessment | train | Adaptation action/priority | 655 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5. | Health | Angola | {
"answer_start": [
18
],
"text": [
"health services and health monitoring*. health. health"
]
} | First NDC | AGO | Health services and assessment | train | GCA_Sector | 656 |
Which subsector forms part of global climate change adaptation subsector in Health Sector ? | Adapt Now subsector | Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5. | Health | Angola | {
"answer_start": [
18,
41
],
"text": [
"health services and health monitoring*. health. health",
"climate change"
]
} | First NDC | AGO | Health services and assessment | test | GCA_subsector | 657 |
What are the Adaptation action/priority for the LULUCF/Forestry Sector? | Action and priority | Total project cost (US $ million): 32.143. Implementing GEF agency: FAO. Promotion of Sustainable Charcoal in Angola through a Value Chain Approach. To reduce the current unsustainable and GHG-intensive biomass production and utilization from Angola's Miombo woodlands via an integrated suite of interventions in the country's charcoal value chain. | LULUCF/Forestry | Angola | {
"answer_start": [
16,
56
],
"text": [
"promotion of sustainable charcoal in angola through a value chain approach",
"charcoal value chain"
]
} | First NDC | AGO | LULUCF/Forestry: General | train | Adaptation action/priority | 658 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The calculation of CO2 emissions and removals from land use changes and forestry is primarily based on the following main activities:- Forestry conversion;- Use of biomass;- Phase-out of harvested land.The sector is thought to have captured close to 3 million tons of CO2e in 2005, and the country is committed to increase carbon sequestration from the forestry sector to 5 million tons of CO2e per year by 2030. Presentation of conditional mitigation options. | LULUCF/Forestry | Angola | {
"answer_start": [
12
],
"text": [
"forestry is primarily based"
]
} | First NDC | AGO | LULUCF/Forestry: General | train | GCA_Sector | 659 |
What are the Adaptation action/priority for the Energy Sector? | Action and priority | Total project cost (US $ million): 32.143. Implementing GEF agency: FAO. Promotion of Sustainable Charcoal in Angola through a Value Chain Approach. To reduce the current unsustainable and GHG-intensive biomass production and utilization from Angola's Miombo woodlands via an integrated suite of interventions in the country's charcoal value chain. | Energy | Angola | {
"answer_start": [
16,
56
],
"text": [
"promotion of sustainable charcoal in angola through a value chain approach",
"charcoal value chain"
]
} | First NDC | AGO | Renewable energy | test | Adaptation action/priority | 660 |
What are the Adaptation action/priority for the Water Sector? | Action and priority | Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19. Improve knowledge of hydrology. Water resources. 2,000,000. 20. Extend water and sanitation network to rural areas. Water resources. Infrastructure. 10,000,000. 21. Explore industrial opportunities from climate change. | Water | Angola | {
"answer_start": [
48
],
"text": [
"extend water and sanitation network to rural areas. water resources"
]
} | First NDC | AGO | Water sanitation | train | Adaptation action/priority | 661 |
Which subsector forms part of global climate change adaptation subsector in Water Sector ? | Adapt Now subsector | Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19. | Water | Angola | {
"answer_start": [
11,
29
],
"text": [
"water resources. water",
"water resources. water"
]
} | First NDC | AGO | Water sanitation | train | GCA_subsector | 662 |
What are the Adaptation action/priority for the Water Sector? | Action and priority | Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19. | Water | Angola | {
"answer_start": [
11,
23,
52,
68
],
"text": [
"water resources. water",
"implement water resources integrated management. water resources. water management. 3,000,000. 17",
"implement water-harvesting system",
"water resources"
]
} | First NDC | AGO | Water management | train | Adaptation action/priority | 663 |
Which subsector forms part of global climate change adaptation subsector in Water Sector ? | Adapt Now subsector | Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19. | Water | Angola | {
"answer_start": [
11,
29
],
"text": [
"water resources. water",
"water resources. water"
]
} | First NDC | AGO | Water management | train | GCA_subsector | 664 |
What are the Adaptation action/priority for the Water Sector? | Action and priority | Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. | Water | Angola | {
"answer_start": [
25,
49
],
"text": [
"increase water availability through village-level wells and boreholes. water resources. water availability",
"water resources integrated management. water resources. water"
]
} | First NDC | AGO | Water supply | test | Adaptation action/priority | 665 |
Which subsector forms part of global climate change adaptation subsector in Water Sector ? | Adapt Now subsector | Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. Energy and Water Sector Action Plan 2013-2017. A characterisation of the two sub-sectors, including infrastructure and the institutional component, which result in commonalities, e.g. | Water | Angola | {
"answer_start": [
6,
13
],
"text": [
"energy and water",
"renewable energy. energy and water"
]
} | First NDC | AGO | Water supply | train | GCA_subsector | 666 |
What are the Adaptation action/priority for the Water Sector? | Action and priority | Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19. Improve knowledge of hydrology. Water resources. 2,000,000. 20. Extend water and sanitation network to rural areas. Water resources. Infrastructure. 10,000,000. 21. Explore industrial opportunities from climate change. | Water | Angola | {
"answer_start": [
36,
57
],
"text": [
"improve knowledge of hydrology. water resources",
"water resources"
]
} | First NDC | AGO | Water: General | train | Adaptation action/priority | 667 |
What are the Adaptation action/priority for the Water Sector? | Action and priority | Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19. | Water | Angola | {
"answer_start": [
11,
24,
68
],
"text": [
"water resources. water",
"water resources integrated management. water resources. water",
"water resources"
]
} | First NDC | AGO | Water: General | train | Adaptation action/priority | 668 |
Which subsector forms part of global climate change adaptation subsector in Water Sector ? | Adapt Now subsector | Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19. | Water | Angola | {
"answer_start": [
11,
29
],
"text": [
"water resources. water",
"water resources. water"
]
} | First NDC | AGO | Water: General | train | GCA_subsector | 669 |
What are the Adaptation action/priority for the Water Sector? | Action and priority | 20. Extend water and sanitation network to rural areas. Water resources. Infrastructure. 10,000,000. 21. Explore industrial opportunities from climate change. 1,000,000. 22. Monitor groundwater. Water resources. 3,000,000. 23. Construct flood protection barriers along major rivers. Water resources. Disaster risk management. 5,000,000. 24. | Water | Angola | {
"answer_start": [
41
],
"text": [
"construct flood protection barriers along major rivers. water resources"
]
} | First NDC | AGO | Water: General | train | Adaptation action/priority | 670 |
Which subsector forms part of global climate change adaptation subsector in Water Sector ? | Adapt Now subsector | Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. Energy and Water Sector Action Plan 2013-2017. A characterisation of the two sub-sectors, including infrastructure and the institutional component, which result in commonalities, e.g. | Water | Angola | {
"answer_start": [
6,
13
],
"text": [
"energy and water",
"renewable energy. energy and water sector action plan"
]
} | First NDC | AGO | Water: General | train | GCA_subsector | 671 |
What is the conditional part of mitigation target provided for the Agriculture Sector ? | Conditional part of mitigation target | Sectors. Description. Promotion of renewable energy. Even though Angola is an oil-producing country, the potential for renewable energy is significant. With the growing energy demand in Angola, this type of project is seen as priority in the Angolan energy sector strategy. | Agriculture | Angola | {
"answer_start": [
46
],
"text": [
"energy sector"
]
} | First NDC | AGO | Agriculture: General | train | Conditional part of mitigation target for a given sectoral plan | 672 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects, and. 6,732 mw hydroelectric projects"
]
} | First NDC | AGO | Renewable Energy | train | Conditional part of mitigation target for a given sectoral downstream actions | 673 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects, and. 6,732 mw hydroelectric projects"
]
} | First NDC | AGO | Renewable Energy | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 674 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1,
24
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects",
"mw hydroelectric projects"
]
} | First NDC | AGO | Renewable Energy: Biofuels | train | Conditional part of mitigation target for a given sectoral downstream actions | 675 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1,
24
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects",
"mw hydroelectric projects"
]
} | First NDC | AGO | Renewable Energy: Biofuels | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 676 |
What is the conditional part of mitigation target provided for the Energy Sector ? | Conditional part of mitigation target | The demand for wood for charcoal is, therefore, also a significant driver of forest degradation and, subsequently, the release of GHG emissions. Biomass consumption (wood-energy and agricultural residues) remains the main source of domestic energy, and energy in small-scale commercial sectors. This intense cutting of trees to produce and supply charcoal to the urban and periurban areas is putting an extreme pressure on the local resources. | Energy | Angola | {
"answer_start": [
43
],
"text": [
"energy, and energy"
]
} | First NDC | AGO | Renewable Energy: Biofuels | train | Conditional part of mitigation target for a given sectoral plan | 677 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects, and. 6,732 mw hydroelectric projects"
]
} | First NDC | AGO | Renewable Energy: Hydro | train | Conditional part of mitigation target for a given sectoral downstream actions | 678 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | Cambambe Hydroelectric Second Power Plant:The Cambambe project activity is located on the Municipality of Cambambe, 180 km east of Luanda, the National Capital. The proposed project comprises a capacity addition to the existing Cambambe Hydroelectric Power Plant with installation of additional 700 MW of the actual generation capacity. | Energy | Angola | {
"answer_start": [
0,
38
],
"text": [
"cambambe hydroelectric second power plant:the cambambe project",
"cambambe hydroelectric power plant"
]
} | First NDC | AGO | Renewable Energy: Hydro | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 679 |
What is the unconditional part of mitigation target provided for downstream actions in the Energy Sector ? | Unconditional part of mitigation target | Cambambe Hydroelectric Second Power Plant:The Cambambe project activity is located on the Municipality of Cambambe, 180 km east of Luanda, the National Capital. The proposed project comprises a capacity addition to the existing Cambambe Hydroelectric Power Plant with installation of additional 700 MW of the actual generation capacity. | Energy | Angola | {
"answer_start": [
0,
38
],
"text": [
"cambambe hydroelectric second power plant:the cambambe",
"cambambe hydroelectric power plant"
]
} | First NDC | AGO | Renewable Energy: Hydro | train | Unconditional part of mitigation target for a given sectoral downstream action | 680 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1,
24
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects",
"mw hydroelectric projects"
]
} | First NDC | AGO | Renewable Energy: Solar | train | Conditional part of mitigation target for a given sectoral downstream actions | 681 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1,
24
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects",
"mw hydroelectric projects"
]
} | First NDC | AGO | Renewable Energy: Solar | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 682 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
0,
24
],
"text": [
"681 mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects",
"mw hydroelectric projects"
]
} | First NDC | AGO | Renewable Energy: Wind | train | Conditional part of mitigation target for a given sectoral downstream actions | 683 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
0,
24
],
"text": [
"681 mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects",
"mw hydroelectric projects"
]
} | First NDC | AGO | Renewable Energy: Wind | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 684 |
What is the unconditional part of mitigation target provided for downstream actions in the Energy Sector ? | Unconditional part of mitigation target | In the absence of project activity, fossil fuels burned in power plants that are connected to the grid. An ex ante estimative of annual emission reductions is 3,282,000tCO2e per year. Tombwa Wind Farm. The Tombwa project activity is located on the Municipality of Tombwa, Namibe Province, 1,234 km east of Luanda, the National Capital. | Energy | Angola | {
"answer_start": [
33
],
"text": [
"tombwa wind farm. the tombwa"
]
} | First NDC | AGO | Renewable Energy: Wind | train | Unconditional part of mitigation target for a given sectoral downstream action | 685 |
What is the unconditional part of mitigation target provided for plans and strategies in the Industries Sector ? | Unconditional part of mitigation target | Sectors. Description. Promotion of renewable energy. Even though Angola is an oil-producing country, the potential for renewable energy is significant. With the growing energy demand in Angola, this type of project is seen as priority in the Angolan energy sector strategy. | Industries | Angola | {
"answer_start": [
46
],
"text": [
"energy sector"
]
} | First NDC | AGO | Industries: General | train | Unconditional part of mitigation target for a given sectoral plan | 686 |
What is the conditional part of mitigation target provided for the LULUCF/Forestry Sector ? | Conditional part of mitigation target | Sectors. Description. Promotion of renewable energy. Even though Angola is an oil-producing country, the potential for renewable energy is significant. With the growing energy demand in Angola, this type of project is seen as priority in the Angolan energy sector strategy. | LULUCF/Forestry | Angola | {
"answer_start": [
46
],
"text": [
"energy sector"
]
} | First NDC | AGO | Afforestation | train | Conditional part of mitigation target for a given sectoral plan | 687 |
What adaptation/mitigation/net-zero targets/objectives are provided for the LULUCF/Forestry Sector ? | Sectoral targets on | The potential for wood cutting each year is estimated at 333,000 m3 and the current rate of cutting is estimated to be 85,000 m3 per year. The calculation of CO2 emissions and removals from land use changes and forestry is primarily based on the following main activities:- Forestry conversion;- Use of biomass;- Phase-out of harvested land.The sector is thought to have captured close to 3 million tons of CO2e in 2005, and the country is committed to increase carbon sequestration from the forestry sector to 5 million tons of CO2e per year by 2030. | LULUCF/Forestry | Angola | {
"answer_start": [
81,
95
],
"text": [
"increase carbon sequestration from the forestry sector to 5",
"year by 2030"
]
} | First NDC | AGO | LULUCF/Forestry: General | train | Targets at the sectoral level | 688 |
What is the unconditional part of mitigation target/efforts provided for the LULUCF/Forestry Sectoral targets? | Unconditional part of mitigation target | The potential for wood cutting each year is estimated at 333,000 m3 and the current rate of cutting is estimated to be 85,000 m3 per year. The calculation of CO2 emissions and removals from land use changes and forestry is primarily based on the following main activities:- Forestry conversion;- Use of biomass;- Phase-out of harvested land.The sector is thought to have captured close to 3 million tons of CO2e in 2005, and the country is committed to increase carbon sequestration from the forestry sector to 5 million tons of CO2e per year by 2030. | LULUCF/Forestry | Angola | {
"answer_start": [
81,
95
],
"text": [
"increase carbon sequestration from the forestry sector to 5",
"year by 2030"
]
} | First NDC | AGO | LULUCF/Forestry: General | val | Unconditional part of the mitigation effort for a given sectoral target | 689 |
What is the conditional part of mitigation target provided for the LULUCF/Forestry Sector ? | Conditional part of mitigation target | Strategic Plan of Disaster Risk Management (2011);. National Action Programme to fight Desertification (2014);. and, above all, the Strategy of Long-term Development for Angola (2025). Many of the actions envisaged in these plans and strategies, particularly in the energy sector, are linked to both adaptation and mitigation. | LULUCF/Forestry | Angola | {
"answer_start": [
1
],
"text": [
"plan of disaster risk management"
]
} | First NDC | AGO | Reforestation | train | Conditional part of mitigation target for a given sectoral plan | 690 |
What are the Adaptation action/priority for the Agriculture Sector? | Action and priority | Conduct studies on the impact of climate change on fishing productivity and coastal economies. Acidification of the sea and fresh water;. Rising water temperature and increased salinization. 17,70. Develop community and school gardens. Increased frequency and intensity of heat waves / heat island effect. 5,00. | Agriculture | Angola | {
"answer_start": [
33
],
"text": [
"develop community and school gardens"
]
} | Revised First NDC | AGO | Agriculture: General | train | Adaptation action/priority | 691 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. | Agriculture | Angola | {
"answer_start": [
56
],
"text": [
"food security, improve nutrition and promote sustainable agriculture"
]
} | Revised First NDC | AGO | Agriculture: General | train | GCA_Sector | 692 |
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ? | Adapt Now subsector | The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. | Agriculture | Angola | {
"answer_start": [
56
],
"text": [
"food security, improve"
]
} | Revised First NDC | AGO | Agriculture: General | train | GCA_subsector | 693 |
What are the Adaptation action/priority for the Education Sector? | Action and priority | Conduct studies on the impact of climate change on fishing productivity and coastal economies. Acidification of the sea and fresh water;. Rising water temperature and increased salinization. 17,70. Develop community and school gardens. Increased frequency and intensity of heat waves / heat island effect. 5,00. | Education | Angola | {
"answer_start": [
33
],
"text": [
"develop community and school gardens"
]
} | Revised First NDC | AGO | Education: General | train | Adaptation action/priority | 694 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. Financing sources. Tax revenue associated with the import of agricultural products; State budget. | Education | Angola | {
"answer_start": [
31
],
"text": [
"food security, improve nutrition"
]
} | Revised First NDC | AGO | Education: General | test | GCA_Sector | 695 |
Which subsector forms part of global climate change adaptation subsector in Education Sector ? | Adapt Now subsector (2) | Besides that, there are other two thematic areas where the government intends to act, which are institutional and climate change education in schools and university, as education is an essential component and a facilitator for responding to global climate change. Angola’s goals related to capacity building training and education are presented in the table below. Table 17 – Capacity building actions. | Education | Angola | {
"answer_start": [
49
],
"text": [
"capacity building training and education"
]
} | Revised First NDC | AGO | Education: General | train | GCA_Subsector_2 | 696 |
What are the Adaptation action/priority for the Agriculture Sector? | Action and priority | Conduct a study on the impact of changing the geographical distribution of animal diseases (infectious and parasitic) and the availability of water on the country's animal production levels. Health risks and disease transmission. 7,50. | Agriculture | Angola | {
"answer_start": [
0
],
"text": [
"conduct a study on the impact of changing the geographical distribution of animal diseases (infectious and parasitic) and the availability of water on the country's animal production levels"
]
} | Revised First NDC | AGO | Agriculture: General | val | Adaptation action/priority | 697 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. | Agriculture | Angola | {
"answer_start": [
56
],
"text": [
"food security, improve nutrition and promote sustainable agriculture"
]
} | Revised First NDC | AGO | Agriculture: General | test | GCA_Sector | 698 |
What are the Adaptation action/priority for the Cross-Cutting Area Sector? | Action and priority | Conduct a study on the impact of changing the geographical distribution of animal diseases (infectious and parasitic) and the availability of water on the country's animal production levels. Health risks and disease transmission. 7,50. | Cross-Cutting Area | Angola | {
"answer_start": [
0
],
"text": [
"conduct a study on the impact of changing the geographical distribution of animal diseases (infectious and parasitic) and the availability of water on the country's animal production levels"
]
} | Revised First NDC | AGO | Capacity building and knowledge transfer | train | Adaptation action/priority | 699 |